Scope and inputs to reconcile
Record the authority having jurisdiction, adopted edition, local amendments and unresolved design approval questions.
Workflow and checks
Use permit/design information to reconcile specified materials, fixtures, pipe sizes and testing. Refer inconsistent or missing requirements to the authorized designer and jurisdiction.
What the output should show
Keep a code-input register linked to drawing/specification references and the estimate’s assumptions.
Exclusions and unresolved decisions
A cost estimate is not a code approval or engineering certification. Code changes and project permit dates must be checked for each job.
Documents to share for a quote
Send project address, permit/design notes, relevant amendment references and the issued drawing set.