Scope and inputs to reconcile
Separate pipe, drainage or pressure fittings, cleanouts, transitions and specified expansion/support components. Identify joining consumables as a purchasing allowance where needed.
Workflow and checks
Trace plans and risers by system, count branch/directional fittings, and reconcile pipe lengths with supplier stock lengths and separately stated waste.
What the output should show
Deliver pipe lengths and fitting counts grouped by system, size and specification, with transitions and consumable allowances visible.
Exclusions and unresolved decisions
Approved locations, product suitability and installation requirements must come from the specification and designer.
Documents to share for a quote
Supply material specifications, system legends, plans and risers before requesting the schedule.