Cast Iron Soil Pipe Takeoff: No-Hub vs Hub-and-Spigot Systems

Measure specified cast-iron drainage pipe and its joint system.

CSI MasterFormat Division 22Project-Specific Labor InputsSchedule Confirmed After Review
Scope
Defined Inclusions
Confirm in the Proposal
Schedule
Project-Specific Delivery
After Drawing Review
Plans
Quantity References
Drawings & Specifications
At a glance

Measure specified cast-iron drainage pipe and its joint system.

A cast-iron soil pipe takeoff separates pipe lengths, drainage fittings, couplings and supports by system and size. Identify the specified hubless or hub-and-spigot system before assembling a material schedule.

Confirm scope and assumptions against your project documents.

Scope and inputs to reconcile

Record drainage and storm runs, branch fittings, cleanouts, transitions and the joint type shown in the specification. Acoustic or fire-related requirements should come from project documents.

Workflow and checks

Trace floor plans and risers together. Count joints at fittings and transitions, then reconcile straight-pipe joint allowances with the purchasing lengths selected by the supplier.

What the output should show

Output pipe length by size, itemized fittings, coupling/joint counts and separately specified supports with drawing references.

Exclusions and unresolved decisions

Do not infer that cast iron is required in every commercial building or substitute one coupling specification for another.

Documents to share for a quote

Supply drainage plans, risers, cast-iron specifications and support details for a scoped material quote.

Reference documents

Related scope and estimating resources

Ready for Bid Day

Request a Project-Specific Plumbing Estimate

Share your PDF drawings, specifications, and addenda. Confirm the quantity, labor, and bid outputs you need, then agree the scope and delivery date in the proposal.

Confirm scope, delivery date, revision terms, and any NDA requirements before work starts.