Scope and inputs to reconcile
Identify tub model, waste/overflow kit, valve/trim, drain connection and specified supports. Distinguish a tub-only unit from a tub/shower combination.
Workflow and checks
Match schedule marks to plans and repeated-unit counts. Check vendor inclusions before adding accessories separately.
What the output should show
Use a fixture register with unit type, quantity, accessories, rough-in/finish phase and drawing reference.
Exclusions and unresolved decisions
Waterproofing, tile, finish repair and structural support belong only where explicitly assigned; do not assume one setting method fits every tub.
Documents to share for a quote
Provide fixture selections, unit counts, bathroom details and vendor-package inclusions.