Share Plans for Scope and Schedule Review

Commercial Water Closet (Toilet) Estimating & Carrier Takeoff

Count water closets and their specified support/flush assemblies.

CSI MasterFormat Division 22Project-Specific Labor InputsSchedule Confirmed After Review
Scope
Defined Inclusions
Confirm in the Proposal
Schedule
Project-Specific Delivery
After Drawing Review
Plans
Quantity References
Drawings & Specifications
At a glance

Count water closets and their specified support/flush assemblies.

Commercial water-closet estimating identifies floor-mounted or wall-hung fixtures and the selected flush arrangement. Bowl counts alone may omit carriers, flush valves and connection accessories.

Confirm scope and assumptions against your project documents.

Scope and inputs to reconcile

Record fixture model, flush valve or tank, seat, carrier/support, flange or outlet connection and supply stop where specified.

Workflow and checks

Reconcile restroom plans with schedules and carrier details. Check sensor power responsibility and whether a fixture package already includes the flush assembly.

What the output should show

List fixtures by mark/type with carrier and flush-package quantities, connection information and supplier inclusions.

Exclusions and unresolved decisions

Fixture selection, accessibility approval and electrical scope should be confirmed with the designer and trade matrix.

Documents to share for a quote

Send restroom plans, fixture schedules, support details and fixture vendor scope.

Reference documents

Related scope and estimating resources

Ready for Bid Day

Request a Project-Specific Plumbing Estimate

Share your PDF drawings, specifications, and addenda. Confirm the quantity, labor, and bid outputs you need, then agree the scope and delivery date in the proposal.

Confirm scope, delivery date, revision terms, and any NDA requirements before work starts.