Scope and inputs to reconcile
Separate floor drains, floor sinks, trench drains and cleanouts. Record trap primers or other specified trap protection and any adjustable drain extensions.
Workflow and checks
Count plan symbols, reconcile riser/detail references and check whether a cleanout is already part of a depicted fitting assembly.
What the output should show
Deliver a drain/cleanout register with type, size, finish, accessory count and drawing reference.
Exclusions and unresolved decisions
Required locations, trap protection and finish loading ratings must come from the design; a generic spacing rule should not replace the plans.
Documents to share for a quote
Send drain schedules, floor finish information, waste plans and trap-protection details.