Share Plans for Scope and Schedule Review

Floor Drain & Cleanout Estimating: Cast Iron, Funnel & Trap Primers

Count drains, cleanouts and the specified trap/access arrangements.

CSI MasterFormat Division 22Project-Specific Labor InputsSchedule Confirmed After Review
Scope
Defined Inclusions
Confirm in the Proposal
Schedule
Project-Specific Delivery
After Drawing Review
Plans
Quantity References
Drawings & Specifications
At a glance

Count drains, cleanouts and the specified trap/access arrangements.

Floor drain and cleanout estimating distinguishes drainage receptors from service access fittings. Tags, floor finishes and details determine the drain body, strainer, access cover and accessories to count.

Confirm scope and assumptions against your project documents.

Scope and inputs to reconcile

Separate floor drains, floor sinks, trench drains and cleanouts. Record trap primers or other specified trap protection and any adjustable drain extensions.

Workflow and checks

Count plan symbols, reconcile riser/detail references and check whether a cleanout is already part of a depicted fitting assembly.

What the output should show

Deliver a drain/cleanout register with type, size, finish, accessory count and drawing reference.

Exclusions and unresolved decisions

Required locations, trap protection and finish loading ratings must come from the design; a generic spacing rule should not replace the plans.

Documents to share for a quote

Send drain schedules, floor finish information, waste plans and trap-protection details.

Related scope and estimating resources

Ready for Bid Day

Request a Project-Specific Plumbing Estimate

Share your PDF drawings, specifications, and addenda. Confirm the quantity, labor, and bid outputs you need, then agree the scope and delivery date in the proposal.

Confirm scope, delivery date, revision terms, and any NDA requirements before work starts.