Scope and inputs to reconcile
Identify wall hydrants, hose bibbs, recessed boxes, locks and specified backflow protection. Record wall thickness/product length where the selected assembly depends on it.
Workflow and checks
Reconcile exterior elevations and plumbing plans, then match each outlet to the fixture schedule and supply branch.
What the output should show
List outlet types, quantities, assembly accessories and unresolved wall or connection dimensions.
Exclusions and unresolved decisions
Freeze protection and backflow requirements require designer/specification confirmation rather than an assumption based only on the state.
Documents to share for a quote
Send elevations, wall details, product schedules and water distribution plans.