Scope and inputs to reconcile
Identify equipment drains, traps, pumps, neutralization assemblies and insulation where specified. Separate primary and auxiliary routes shown in the design.
Workflow and checks
Match equipment tags to mechanical schedules, reconcile routing with plumbing details and count elevation changes not visible on the floor plan.
What the output should show
Produce a route schedule by equipment tag with pipe size/material, measured length, accessories and discharge interface.
Exclusions and unresolved decisions
Drain sizing, trap configuration, neutralization and approved discharge location must come from design/manufacturer documents.
Documents to share for a quote
Provide mechanical/plumbing plans, equipment instructions and the trade scope matrix.