Share Plans for Scope and Schedule Review

Mop Basin & Service Sink Estimating: Janitor Closet Fixtures

Count janitorial basin and service-faucet assemblies.

CSI MasterFormat Division 22Project-Specific Labor InputsSchedule Confirmed After Review
Scope
Defined Inclusions
Confirm in the Proposal
Schedule
Project-Specific Delivery
After Drawing Review
Plans
Quantity References
Drawings & Specifications
At a glance

Count janitorial basin and service-faucet assemblies.

Mop basin and service sink estimating reconciles the selected basin, faucet, drain and accessories with janitor-room details. Floor-mounted basins and elevated service sinks should remain distinct fixture types.

Confirm scope and assumptions against your project documents.

Scope and inputs to reconcile

Record basin material/configuration, faucet assembly, drain, hose/holder accessories and specified wall protection or rim guards.

Workflow and checks

Match plan tags to schedules and review supplier inclusions. Reconcile waste connections and water branches with the piping takeoff.

What the output should show

List basin and faucet packages, accessories, connection sizes shown in the schedule and mounting responsibilities.

Exclusions and unresolved decisions

Wall finishes, waterproofing and product acceptance require separate confirmation. Do not count an accessory twice when supplied in the package.

Documents to share for a quote

Send janitor-room details, fixture schedules and supplier package information.

Related scope and estimating resources

Ready for Bid Day

Request a Project-Specific Plumbing Estimate

Share your PDF drawings, specifications, and addenda. Confirm the quantity, labor, and bid outputs you need, then agree the scope and delivery date in the proposal.

Confirm scope, delivery date, revision terms, and any NDA requirements before work starts.