Scope and inputs to reconcile
Identify compartment configuration, faucet/pre-rinse assembly, drain components, mounting and any shown indirect-waste receptor connections.
Workflow and checks
Match equipment tags to the plumbing schedule and connection details, then distinguish supplied accessories from field-installed parts.
What the output should show
Record each sink package, connections, accessory inclusions and plumbing-versus-equipment supplier responsibility.
Exclusions and unresolved decisions
Health approval, interceptor sizing and electrical equipment connections are separate decisions; do not infer a required drain arrangement from the sink name.
Documents to share for a quote
Send foodservice schedules, rough-in details, fixture cutsheets and trade responsibility notes.