Scope and inputs to reconcile
Separate fixture bodies, flush valves, carrier/support assemblies, strainers and supply stops where specified.
Workflow and checks
Reconcile restroom plan marks with schedules and mounting details. Check compatibility of the specified body and flush arrangement through product documentation.
What the output should show
Produce a marked fixture register with body, flush and support quantities and vendor package inclusions.
Exclusions and unresolved decisions
Required consumption, mounting/accessibility criteria and sensor power scope remain design and trade-interface questions.
Documents to share for a quote
Send fixture cutsheets, mounting details and restroom schedules for the takeoff scope.