Ductile Iron Pipe (DIP) Takeoff for Site Utilities & Water Mains

Measure specified underground pressure piping and connection assemblies.

CSI MasterFormat Division 22Project-Specific Labor InputsSchedule Confirmed After Review
Scope
Defined Inclusions
Confirm in the Proposal
Schedule
Project-Specific Delivery
After Drawing Review
Plans
Quantity References
Drawings & Specifications
At a glance

Measure specified underground pressure piping and connection assemblies.

Ductile-iron pipe takeoff identifies pipe size, class, joint system and connection assemblies from the utility design. Underground pipe length alone does not describe restraint, fittings or earthwork quantities.

Confirm scope and assumptions against your project documents.

Scope and inputs to reconcile

Separate pipe, bends, tees, valves, transition fittings and specified restraint or protection. Keep designed thrust/restraint details identifiable by drawing reference.

Workflow and checks

Reconcile civil plans with profiles and connection details. Measure changes in size and elevation, count assemblies, and link excavation assumptions to the specified trench section.

What the output should show

Request a pipe/fitting schedule, joint and restraint register, structure connections and separately measured trench quantities.

Exclusions and unresolved decisions

Pressure class selection, thrust-block design and corrosion protection are design decisions; do not create those requirements from a generic takeoff rule.

Documents to share for a quote

Provide utility plans/profiles, product specifications and approved connection and restraint details.

Related scope and estimating resources

Ready for Bid Day

Request a Project-Specific Plumbing Estimate

Share your PDF drawings, specifications, and addenda. Confirm the quantity, labor, and bid outputs you need, then agree the scope and delivery date in the proposal.

Confirm scope, delivery date, revision terms, and any NDA requirements before work starts.